UNIVERSITI TUNKU ABDUL RAHMAN

Year 2024

STAFF NAME
GRANT/ COLLABORATION
RESEARCH TITLE
Amount (RM)
START DATE
(dd-mmm-yy)
END DATE
 (dd-mmm-yy)
LEONG KAH HON
Kitaran Recovery Sdn Bhd 
Feasibility Study of Converting Glove Former and Glass Waste   into Useful and Valuable Material 
38000
1/12/2023
30/11/2024
LIM SIONG KANG
Research Funding
Effect of Cement Type in Malaysia on Mechanical Properties of Concrete
6000
1/7/2023
30/6/2025
TOH TIEN CHOON
RESEARCH PROJECT
Factors for Automation in Architecture, Engineering and Construction
1000
1/1/2024
31/1/2025
CHIN REN JIE
MTSF STRG
Blending of Error Analysis and Machine Learning Technique for Satellite Precipitation Estimations in Malaysia
15000
1/1/2024
31/12/2024
SIM LAN CHING
MOHE FRGS 2023
Quantitative structure-activity relationship and first principle investigation of oxygen-functionalized graphitic carbon nitride to elucidate mechanism and electron transfer pathway for water treatment
97250
1/10/2023
30/9/2025
CHIN REN JIE
MOHE FRGS 2023
Integration of Error Analysis and Machine Learning Technique in Satellite Precipitation Estimations for Extreme Floods in Malaysia
83180
1/10/2023
30/9/2025
SIM LAN CHING
RESEARCH PROJECT
Feasibility Study of Green New Technologies Industrial Wastewater System to (i) use solar evaporator method to reduce plating in wastewater to a maximum amount as desired by the Company; (ii) achieve WWTP wastewater discharge reduction; and (iii) reduce chemicals treatment in wastewater treatment plant (WWTP)
16500
6/6/2024
5/6/2026
LEE FOO WEI
UTARRF 1/2023
Biocoagulant from Biomass for Water Treatment (Sustainable resources)
24000
1/7/2023
30/6/2024
YIP CHUN CHIEH
UTARRF 2/2023
Correlation of Geopolymer Composite Flyash Concrete with Hydrostatic Resistance
28000
1/11/2023
31/10/2024
LIM SIONG KANG
UTARRF 2/2023
Enhancing the Mechanical Properties of Lightweight Foamed Composite using Treated Kenaf Fiber
24000
1/11/2023
31/10/2024